LUXLAV CH 13′ 3-STATION PRIVATE RESTROOM
Standard Features
- 3 Private Restrooms
- 13′ Trailer Length
- 425 Gallon Waste Tank
- Smooth Grey FRP Interior
- Pewter Gray Exterior
- Oversized Structural Steel Beams
- All Steel Cage Construction
- Independent Torsion Axles
- Electric Brakes
- 16″ 8-Lug Rims
- Marine Grade Subfloor
- One Piece Aluminum Seamless Roof
- Smooth Aluminum Exterior Siding
- Poly Insulation
- Chip Resistant Undercoating
- Commercial PEX Water Lines
- Scissor Jack Stabilizers
- Vinyl Sheet Flooring
- FRP Fiberglass Wall Panels
- Heavy Duty Fold-Up Aluminum Steps & Handle
- Timed Faucets
- Keyed Alike Locks
- LED Interior Lighting
- LED Exterior Lighting
- E-Z Lube Hubs
- 2 5/16″ Trailer Receiver
- 1 Roof A/C Unit
- 110V Shore Power Connection
- Doors on Streetside
- Waterproof White Trim Package
Optional Features
- BASIC Cold Weather Comfort Package – Private Rooms
- An electric heater added to each restroom
- Designed for operation in temperatures 25° and above
- Cold Weather Operation Package
- Plumbing freeze protection
- Electric heater for the utility room
- 225 Gallon Fresh Water Tank / Pump System (215 gallons usable)
- Hot Water Heater (Utility Handwash)
- Diamond Plate Rock Guard
- Spare Tire (Mounted)
- Vacant / Occupied Deadbolt Indicators
- (3) Double Roll Toilet Paper Dispensers
- (3) Stainless Steel C-Fold Towel Dispensers
– All information contained herein including, but not limited to, floorplan offerings, specifications, standards, and options are based on the latest information at the time of publishing. This information is subject to change at any time, without notice or obligation. Prices are subject to change due to raw material shortages and availability. All freight estimates will be based on current fuel rates at the time the unit is shipped.
– All Photos are for representation purposes, finishes and layouts are subject to change.
– All Trailers Are Sold on A First Come-Basis and Require a NON-REFUNDABLE 25% Deposit to Secure VIN# Or New Order. All Trailers Must Be Paid for In-Full 7-10 Days Prior To Completion – No Exceptions!










